January 31, 2011 - With the interior of the car completely stripped, Adam continues the prep work for the tunnel modifications. First, the factory braces on the sides of the tunnel are cut off. Then the seam sealer is removed. The braces will be welded back into place once the modifications are done.
tags: body |